I think you should hire an electrician. No joke.

You don't add up the amps of the breakers to get the total size of the panel. You analyze the actual peak load you'll see. You're going to run all that shit at once? I doubt it.

Going to a bigger panel is fine. You just need bigger wires feeding the panel, unless you downsize the main breaker.

As for how to run things, I'd look at code.