View Single Post
Old 12-06-2013, 02:33 PM   #30
Robftss
Senior Member
 
Join Date: Jun 2013
Drives: VW
Location: Canada
Posts: 270
Thanks: 190
Thanked 392 Times in 145 Posts
Mentioned: 109 Post(s)
Tagged: 3 Thread(s)
Quote:
Originally Posted by digital_assassin View Post
This is a very easy install. I did it by myself and it took me 2 nights, or 8 hours total. It would have taken much less time if I didn't have to research how to change the outlet position of the Rotrex and if the Oil Reservoir / Cooler instructions were better. I would think that now that I've done one I could do it in about 5 hours start to finish.

I probably wont start the car till tomorrow. I didn't get a tune from KW and will be limping it to @Drift-Office on Saturday and dropping it with him for the week.
By what means did you prime the traction fluid system?
You could remove the gearbelt and run N/A en route to Bob.
Robftss is offline   Reply With Quote