Quote:
Originally Posted by DAEMANO
Thanks for all the extra info Fenton. I know you've been hard at work testing (torture isn't it? ). The above + the 6-12 mo timeline goes a long way to setting my mind at ease. I'll start a spring/summer 2015 fund just in case. I'm in with Phantom for the long haul.
|
No problem.
There needs to be a lot of data before things are deemed safe and reliable. Getting through some of the install jitters goes a long way to increasing the device longevity as well.
Rob is a real stickler for doing things right the first time and over engineering whereever possible.
Right now his tq250 would still be considered a trail/test period. Especially considering we are adding more power and amps via the additional batteries of the 1.5 and aux charger.
Robs main kit has the standard dump with no DR and that's it....the miata guys run this and that system can work all day long.