Lots of progress today, I have just completed all the pivot locations on the jig.
The last one was a little tricky as I wanted to include a little anti-squat reduction into the design.
It started by making some drilled angle which would move the pivot down and slightly forward.
Then this was simply bolted into the factory location and squared off the table.
Here is a photo of the completed pivot location in its new lower position.
and a couple of photos of the completed pivots. I'm getting better at using the MIG welder, this job has given me a lot of practice.
The final part involves locating the four main subframe attachment points. This is a little tricky as I have to make them removable with bolts otherwise I will not be able to separate the cradle from the jig. More on that later....
Joel.