View Single Post
Old 05-27-2017, 05:38 AM   #19
DIY
Senior Member
 
DIY's Avatar
 
Join Date: Jul 2016
Drives: BRZ, WRX
Location: Sydney, Australia
Posts: 291
Thanks: 105
Thanked 962 Times in 233 Posts
Mentioned: 2 Post(s)
Tagged: 0 Thread(s)
Lots of progress today, I have just completed all the pivot locations on the jig.

The last one was a little tricky as I wanted to include a little anti-squat reduction into the design.

It started by making some drilled angle which would move the pivot down and slightly forward.



Then this was simply bolted into the factory location and squared off the table.



Here is a photo of the completed pivot location in its new lower position.



and a couple of photos of the completed pivots. I'm getting better at using the MIG welder, this job has given me a lot of practice.





The final part involves locating the four main subframe attachment points. This is a little tricky as I have to make them removable with bolts otherwise I will not be able to separate the cradle from the jig. More on that later....

Joel.

Last edited by DIY; 07-01-2017 at 07:28 AM.
DIY is offline   Reply With Quote