Quote:
Originally Posted by Jdmjunkie
What was the lead time on that?
|
From the time everyone in the group paid to have the molds made to truck in front of my house with a hood was about 12-13 months.
Marsh Composites does high grade stuff but they're not a big shop and have a lot of demand.