I ended up doing a piece of 1/8" aluminum L with some elevator bolts through the bottom, it easily passes the stand test so I think we're good for now.
New Doryoku valve cover with a serviceable baffle, front shaved for hood clearance, and a 10an ORB on top installed.
Xidas showed up today

Maybe I'll do all of the suspension this weekend.