View Single Post
Old 01-14-2023, 06:00 PM   #51
tazio
Member
 
Join Date: Aug 2022
Drives: Don't yet have a Toyobaru
Location: USA
Posts: 21
Thanks: 0
Thanked 1 Time in 1 Post
Mentioned: 0 Post(s)
Tagged: 0 Thread(s)
Quote:
Originally Posted by jeepmor View Post
Our solar stuff let us down constantly. It was early in start up doing development though, in a half billion dollar factory. $10K failures were pretty common in the first year or two. Epoxy would fail and send a 65 pound ingot into a two foot diameter drum and waste it on a multimillion dollar tool, at 15m/s. Epoxy giving me flashbacks, don't mean to hijack the thread, just enjoy the trials and tribulations of engineering a product to market. It takes so much so many never even fathom.

What were you making? Why were 65 pound ingots suspended ~11.5 meters (Did I do that back of the envelope math right? 15m/s final speed divided by 9.8m/s/s gives the time it fell; multiply by that by an average speed of 7.5m/s to find the distance.) above two foot diameter drums and how did that waste a multimillion dollar tool?
tazio is offline   Reply With Quote