All right! The train is a moving. I can expect it's gonna take at least a two weeks to arrive since they're located in New Zealand. But this was really the last part I needed to begin putting together everything. In the meantime I can start routing all the wiring and mounting the second phantom in place. after speaking with jelke the designer of the torqamp I opted for installing an intercooler. His input was that while the two superchargers won't generate enough heat to become a risk the cooler denser air could definitely be a benefit. In producing slightly better results. That and the fact that where I live in summer temperatures reach as high as 110°F so If you live in a cold environment. The intercooler would be something you could opt out. Hope the guy building the torqamp kit is getting his soon.