View Single Post
Old 05-01-2020, 07:28 PM   #5475
CSG Mike
 
CSG Mike's Avatar
 
Join Date: Jul 2012
Drives: S2000 CR
Location: Orange County
Posts: 14,562
Thanks: 8,942
Thanked 14,211 Times in 6,854 Posts
Mentioned: 970 Post(s)
Tagged: 14 Thread(s)
Quote:
Originally Posted by stacyu18 View Post
for anyone thinking about installing the c38 supercharger by yourself let me tell you that it is no easy process. I work on cars for a living and know what i am doing but to the normal person it will be a bitch. the best thing to do is break it down into days.day 1 take off the tires,fender wells,the under cover then the bumper.day 2 install the super charger. day 3 install the inter cooler and piping for me this was the most time consuming job due to the fact you had to make sure that the piping was set well enough that you could fit your headlights in and make sure that you have a screw gun or electric screwdriver and tape measure this will help a hell of alot. day 4 install the oil cooler and lines. day 5 install the tune check all hoses for leaks make sure that nothing is going to rub the fans or engine to burn anything and take car for test drive. day 6 if all is good and car is not leaking reinstall the bumper,fender wells,under cover and make sure that you didn't forget anything. some people may just say or take it to a shop to have done,well you can do that also but a extra 1000 dollars is a lot to some people.so i hope this help some people out. good luck on your adventure if you do it yourself.BTW each day maybe up to 3 hours.
The first time will always be the toughest! The first time I attempted an installation, it took me about 12 hours.
CSG Mike is offline   Reply With Quote
The Following User Says Thank You to CSG Mike For This Useful Post:
HachiRokuX (05-17-2020)