|
Work continues. Lots of small tasks to complete,, basically a punch list before I try to start. Tomorrow I'll finish up a few then pull the motor hopefully for the last time. The biggest tasks are install the clutch, crank pully and oil pan. I want to detail the engine compartment as it's been sitting open for over two years and there's a little paint work to do as well. I need to detail the motor as well. It's amazing what the salt air does to aluminum.
July this year will be three years,,, just dam.
- Fix Dipstick
x Shorten lower radiator hard line
x Weld in bung on hard line for surge tank supply
X Lengthen fuel hose
x Trace and confirm location VSS and E85 wires
X Install Gas Cap
x Install pressure switch for AC
X Fab AC Lines
x Resolve PCV Lines
- Install Puke Tank
x Install clutch remote bleed
Pull motor/trans
Tighten Engine Side Fuel Line
Paint Valve Covers - Maybe
Detail engine bay
Detail Motor
Paint front support and above headlights
Install/Seal oil pan & pickup tube
Install new clutch
Install crank pulley
Fab transmission dust shield
Replace VSS
Install motor/trans
Fill Transmission
Install Oil Filter - Oil
Water
Reinstall dash
__________________

2015 FR-S - One Day I'll Finish The Swap
|