View Single Post
Old 07-18-2012, 04:05 AM   #35
H8R GTS
Member
 
Join Date: Jun 2012
Drives: Probably not an 86 GTS
Location: Victoria
Posts: 57
Thanks: 2
Thanked 12 Times in 8 Posts
Mentioned: 1 Post(s)
Tagged: 0 Thread(s)
Quote:
Originally Posted by Isometric Bacon View Post
I'm a bit worried about this myself. My dealer keeps telling me that it's going to be 'October production date, November delivery' but hasn't given me the tracking details. He gave me the stock number, but not the other code. He said he'd let me know 'sometime this week' but I'm starting to wonder.

The car is a Orange GTS, which apparently has a huge wait on it. I ordered on the 25th of June.

I suspect he might be screwing me around to keep his sale, because I specifically put in the contract that I can pull out if the car isn't delivered by October.

If he's screwing me around and I have a 18 month wait, i'm going to be livid.
I was in the same boat @Isometric Bacon. I had asked a few times about the web access. I decided today that I would deal with it, called the dealer, gave them the "I'm the customer and if everything is ok with my order it shouldn't be a problem to give me information I need to log in" speech. I now have them.

I ordered an Orange GTS manual myself first week of June, and in the conversation today I was given the indication that it will probably be November build with maybe December, probably January Delivery. If this turns out to be the case I will be not very happy.
H8R GTS is offline   Reply With Quote