Quote:
Originally Posted by xjohnx
Mind if i ask how much that runs? How long does it take?
|
So Jon Bond says 750-850. Supposed to be less than two weeks. I'll post back here with details when I know more. I'm also having a dyno done immediately after. I kept the original dynos so I'll have a good baseline, in the event there are any performance differences before/after. Outside of seals being replaced with high temp seals, I'm doing ceramic coated rotors as well as a pressure relief.
I'll keep everyone posted.