View Single Post
Old 08-15-2014, 12:03 PM   #415
GodzillaC
Member
 
GodzillaC's Avatar
 
Join Date: Aug 2014
Drives: FR-S RS1 #291
Location: Reading, PA
Posts: 47
Thanks: 5
Thanked 20 Times in 15 Posts
Mentioned: 0 Post(s)
Quote:
Originally Posted by Ametatsu View Post
Do you know if they actually put the order in? I put down a deposit for one last week, however the dealer tells me that they are still waiting on a car to be allocated to my region before they can put an actual order in.
I placed a deposit on one on 7/30 with the local dealer in PA. The part number for the rs 1.0 was still showing in their systems as an old scion model at that time. The build process was described as follows.... The cars will be generally allocated to the dealers. Once the factory assigns the vehicle as being allocated to the dealer, and headed to productionthe dealer can go in and, if possible, modify the basic build. This happens every 2 weeks for the production schedule. My dealer was not on the first allocation which was last wednesday and we're hoping to be there in the 27th. At least that is the process as described to me. If anyone has additions or contradictions, i'd wecome the info.
GodzillaC is offline   Reply With Quote