Quote:
Originally Posted by Sirsimon
Forgive me if I missed this (I did search the thread), but what kind of install times are you guy seeing with this kit?
|
You missed it... JKJK
It took me (I was a noob at installing an SC kit) about a day and a half. I started Saturday morning (8AM)... stopped around 7PM... finished up Sunday starting around 7AM... and I turned the key to start the engine around 10AM. Keep in mind, I also did an oil change, added the JR Oil Cooler Kit, and installed DSS aluminum driveshaft... And a Raceseng pulley kit...
If it was just the SC kit... Shouldn't take longer than a day...